Trade Quantity Takeoff Services, One CSI Division at a Time

Open the trade you actually bid. Each guide lists what is counted, the CSI MasterFormat numbers, the software commonly used for that division, the drawings to send, and the questions that sheet set usually raises. City and state copies of these guides have been consolidated so the measurement method is not repeated under a new place name. Per estimate, a trade file is typically $150 to $1,000. Most estimates come back in 24 to 48 hours, and the divisions you include set the fee.

Drawings and units by division

TradeCSISend these sheetsSchedule units
Concrete03Structural foundation, slab, and rebar schedulesCubic yards, tons of reinforcement, square feet of contact area
Drywall09Partition types, finish schedule, reflected ceiling planBoard square feet, stud and track lengths, ceiling grid counts
Flooring09Finish plans, room schedule, product sizesNet area by finish, linear feet of base and transitions
Roofing07Roof plan, slopes, drain locations, assembly detailsSquares or membrane area, insulation boards, flashing lengths
Painting09Finish schedule, elevations, coating specSurface area by coating, trim lengths, opening deductions
Electrical26Lighting, power, one-line, panel schedulesConduit and wire lengths, device and equipment counts
Plumbing22Plans, isometrics, fixture schedulesPipe lengths by system and size, fixture and equipment counts
HVAC23Duct plans, schedules, piping diagramsDuct weight or length, equipment counts, pipe and insulation
Fire Protection21Sprinkler plans, riser diagram, equipment scheduleHead counts, pipe lengths, fittings, listed equipment

If you need the commercial file structure rather than a single trade, compare commercial estimating and residential estimating.

Questions about trade scope

Why is there one page per trade instead of one page per city?

The measurement rules change with the trade: a cubic yard of concrete is not a square of roofing. The city does not change the unit. Project location is handled on the service-area page and, more importantly, on the drawings for that job.

Do these guides include labor hours or installed prices?

The trade guides describe quantities and how they are separated. Labor hours and installed prices belong in a priced estimating scope, and only when the proposal names the rate source. A trade guide is not a bid.

What if my package includes several trades?

Say which divisions are included, which are by others, and whether you want one workbook or separate files. Mixed packages are scoped on the quantity takeoff or construction estimating page, then measured with the rules on each trade guide.

How much does a trade takeoff cost?

Most trade takeoffs typically cost $150 to $1,000 per estimate. Project size and the divisions in scope move the fee.

How fast is a trade takeoff?

Most trade takeoffs are typically delivered in 24 to 48 hours.