Trade Quantity Takeoff Services, One CSI Division at a Time
Open the trade you actually bid. Each guide lists what is counted, the CSI MasterFormat numbers, the software commonly used for that division, the drawings to send, and the questions that sheet set usually raises. City and state copies of these guides have been consolidated so the measurement method is not repeated under a new place name. Per estimate, a trade file is typically $150 to $1,000. Most estimates come back in 24 to 48 hours, and the divisions you include set the fee.
Drawings and units by division
| Trade | CSI | Send these sheets | Schedule units |
|---|---|---|---|
| Concrete | 03 | Structural foundation, slab, and rebar schedules | Cubic yards, tons of reinforcement, square feet of contact area |
| Drywall | 09 | Partition types, finish schedule, reflected ceiling plan | Board square feet, stud and track lengths, ceiling grid counts |
| Flooring | 09 | Finish plans, room schedule, product sizes | Net area by finish, linear feet of base and transitions |
| Roofing | 07 | Roof plan, slopes, drain locations, assembly details | Squares or membrane area, insulation boards, flashing lengths |
| Painting | 09 | Finish schedule, elevations, coating spec | Surface area by coating, trim lengths, opening deductions |
| Electrical | 26 | Lighting, power, one-line, panel schedules | Conduit and wire lengths, device and equipment counts |
| Plumbing | 22 | Plans, isometrics, fixture schedules | Pipe lengths by system and size, fixture and equipment counts |
| HVAC | 23 | Duct plans, schedules, piping diagrams | Duct weight or length, equipment counts, pipe and insulation |
| Fire Protection | 21 | Sprinkler plans, riser diagram, equipment schedule | Head counts, pipe lengths, fittings, listed equipment |
If you need the commercial file structure rather than a single trade, compare commercial estimating and residential estimating.
Questions about trade scope
Why is there one page per trade instead of one page per city?
The measurement rules change with the trade: a cubic yard of concrete is not a square of roofing. The city does not change the unit. Project location is handled on the service-area page and, more importantly, on the drawings for that job.
Do these guides include labor hours or installed prices?
The trade guides describe quantities and how they are separated. Labor hours and installed prices belong in a priced estimating scope, and only when the proposal names the rate source. A trade guide is not a bid.
What if my package includes several trades?
Say which divisions are included, which are by others, and whether you want one workbook or separate files. Mixed packages are scoped on the quantity takeoff or construction estimating page, then measured with the rules on each trade guide.
How much does a trade takeoff cost?
Most trade takeoffs typically cost $150 to $1,000 per estimate. Project size and the divisions in scope move the fee.
How fast is a trade takeoff?
Most trade takeoffs are typically delivered in 24 to 48 hours.