Takeoff review checklist and publication policy

Use this checklist to agree the review requirements for a project. The proposal should identify the assigned contact, included checks and revision terms.

Document control

Record the drawing issue, sheet register, specifications and addenda included in the appointment. List missing sheets and unresolved discrepancies. Keep base bid, alternates and later revisions separate.

Measurement checks

Check each sheet scale against a stated dimension. Record measurement units and distinguish net quantities from waste or ordering allowances. Compare repeated rooms, schedules and plans without assuming that every repeated unit has the same scope. Review formulas and conversions before totals are used for pricing.

Scope assumptions and exclusions

Identify owner-furnished equipment, demolition, temporary works, design allowances and trade interfaces. A takeoff does not establish code compliance or substitute for engineer-approved details. Resolve design questions with the project team and record any remaining assumption.

Published evidence

Selected samples must distinguish excerpts from complete estimates. Hypothetical examples must be labelled illustrative. Customer results, credentials, software usage and turnaround claims require supporting evidence before publication. Calculators explain dimensional methods and do not constitute project-specific design advice.

Corrections and project review

Send the page URL or quantity row reference, relevant drawing revision and correction details to info@quantitytakeoffexperts.com. For project deliverables, confirm the applicable review period and revision scope in the proposal.