Industrial Quantity Takeoff Services from the Issued Sheets

Industrial quantity takeoff services measure plants, process buildings, and site packages from the sheets that exist. They are not priced as a single square-foot factor. Each system is either counted from an issued sheet or marked unresolved. Industrial work for most estimates is $150 to $1,000, typically returned in 24 to 48 hours. Which systems you include is the scope that moves the fee.

This is separate from concrete takeoff for building foundations and from commercial estimating for tenant and shell packages. Say which systems are in your bid.

What is counted, and what is not

SystemCounted when the set includesLeft out of the quantity
Structural steel and deckFraming plans and a member or joist schedule. Tonnage is grouped by the marks shown, with deck and joists in their own rows.Connection design, shop drawings, and crane picks unless a hoist study is an agreed exhibit.
Industrial slabs and equipment padsThickness, mix notes, joint layout, and pad dimensions. Thickened edges and pits are separate rows when they are detailed.Ready-mix price, pump, and waste. Those stay blank until you set the allowance.
Civil cut, fill, and pavingSections, contours, or a surface file the proposal accepts. Pavement section thicknesses come from the civil details.Haul price, tipping fees, and volumes with no section to measure.
Process pipe and equipmentIsometrics or scaled plans for length. Valve and equipment schedules for counts, kept by size and spec.Stress analysis, line sizing, and any length inferred from a P&ID schematic.

Illustrative schedule rows

These rows show the workbook layout. They are not quantities from a real plant, and they are not a bid.

DescriptionUnitSourceStatus
Wide-flange steel, grouped by piece marktonS-sheets and column scheduleMeasured if marks are listed
Slab on grade at the thickness notedcyStructural slab planNet volume; waste separate
Cut to the subgrade showncyCivil sections or accepted surfaceOpen if the survey is missing
Carbon-steel pipe by nominal sizelfIsometricNot scaled from a P&ID
Listed process valveeaValve scheduleCounted; not priced here

Software follows the file you send. PDF plans are measured from the sheets. A surface or model is used only when the proposal names that file type. The proposal does not assume a particular earthwork product is available for every upload.

Questions on industrial scope

Do you design the steel, the drainage, or the process system?

No. The schedule counts members, areas, volumes, and equipment that are already on the drawings or listed in a schedule you send. Connection design, hydraulic calculations, and equipment selection stay with the engineer of record.

Can earthwork be quantified from a PDF site plan?

Only when the civil set has enough sections, contours, or a stated thickness to measure. A vicinity map is not a volume. If you send a surface file, the proposal says whether that file type is in scope. Volumes are not invented to fill a missing survey.

How are process-pipe quantities handled when the set is P&IDs only?

P&IDs can support a valve and equipment count. Linear feet need isometrics or scaled plans. If those sheets are absent, pipe length is listed as unresolved instead of scaled from a schematic line.

What files come back?

A workbook with system, description, unit, quantity, sheet reference, and an assumption or exclusion column, plus the scope statement from the proposal. Prices are included only when the proposal names the rate source. Labor hours are not implied by a tonnage or cubic-yard row.

How much does an industrial estimate cost?

Most industrial estimates typically cost $150 to $1,000 per estimate. Plant size and the systems you include are what move the fee.

How fast is an industrial estimate?

Turnaround is typically 24 to 48 hours for most industrial estimates.