Documents, not a city template
The cover sheet, general notes, and specifications name the jurisdiction and the editions the designer used. The takeoff cites those sheets. It does not swap the city name into a generic material list.
Quantity Takeoff Experts measures from the plans you upload. The same desk can work a project in any state. There is no local storefront behind a city or county URL, and a statewide page is not a code determination. The fee does not change because a project sits in another state. Most estimates are typically $150 to $1,000, with a usual turnaround of 24 to 48 hours, and project size and scope still set the price.
Older state, county, and city URLs now point here or to the matching trade guide. Use the trade pages for how a scope is measured, and use this page for what to send when the jurisdiction changes.
The cover sheet, general notes, and specifications name the jurisdiction and the editions the designer used. The takeoff cites those sheets. It does not swap the city name into a generic material list.
Wind, snow, seismic, frost depth, flood, and energy notes matter when they change a specified assembly: bar size, insulation thickness, roof attachment, equipment, or foundation type. If the note is missing, the row stays open.
The designer and the authority having jurisdiction decide code compliance. A quantity schedule is not a structural calculation, a hydraulic design, or a permit. Ask the reviewer named in your proposal when a sheet conflicts.
Start with the quantity takeoff scope if you need measurements without prices, or the trade guides for division-specific units. The review checklist explains how assumptions are recorded.
The checks below are planning context compiled from published climate and code-adoption references. They are not a live adoption list, a soil report, or a bid instruction. Confirm the edition and local amendments on the drawings and with the jurisdiction. Code-adoption maps are published by the International Code Council.
| State | Climate zone used as context | Check before you price from the schedule |
|---|---|---|
| California (CA) | IECC Climate Zones 3B, 4B, and Microclimates 1-16 | Always verify Seismic Design Category on General Notes Sheet S-001. A shift from Category C to D substantially increases structural steel weld inspections and rebar tie density. |
| Texas (TX) | IECC Climate Zones 2A, 2B, 3A, and 3B | In coastal counties (Harris, Galveston, Nueces, etc.), verify if TDI Windstorm Inspection certification is required. Missing windstorm-rated clips, windows, or roof fasteners can prevent occupancy. |
| Florida (FL) | IECC Climate Zones 1A and 2A (Very Hot, Humid Subtropical/Tropical) | Verify if the project is in the HVHZ (Miami-Dade/Broward). HVHZ compliance requires strictly tested products with active Product Approvals (NOAs), which carry a 20-35% cost premium on fenestration and roofing. |
| New York (NY) | IECC Climate Zones 4A, 5A, and 6A | For NYC projects, always review whether public or prevailing wage (Labor Law 220) applies. NYC union labor trade rates and work rule jurisdictional boundaries significantly alter total labor costs. |
| Illinois (IL) | IECC Climate Zones 4A and 5A (Cold, Humid Continental) | In the City of Chicago, electrical estimates must account for 100% metal conduit installation—never estimate residential NM (Romex) cable within city limits as it violates the Chicago Electrical Code. |
| Pennsylvania (PA) | IECC Climate Zones 4A and 5A (Mixed-Humid & Cold Continental) | Along the I-78 and I-81 warehouse corridors (Lehigh and Cumberland valleys), geotechnical reports frequently show active karst sinkholes. Include specific line items for rock grouting or geogrid subgrade stabilization. |
| Ohio (OH) | IECC Climate Zones 4A and 5A (Cold Continental) | In the Greater Columbus area (Licking and Delaware counties), mega-projects are straining local trade subcontractor capacity; verify current labor escalation factors on bid day. |
| Georgia (GA) | IECC Climate Zones 3A and 2A (Humid Subtropical) | Factor in wet-weather earthwork delays when bidding Piedmont clay sites. Saturated Georgia red clay cannot be compacted to 95% standard Proctor without extensive drying or chemical stabilization. |
| North Carolina (NC) | IECC Climate Zones 3A, 4A, and 5A in western Blue Ridge Mountains | In coastal counties (Dare, Carteret, New Hanover), verify whether coastal wind-borne debris regulations mandate impact-rated windows or engineered storm shutters. |
| Michigan (MI) | IECC Climate Zones 5A (Lower Peninsula) and 6A (Upper Peninsula) | In western Lower Peninsula and Upper Peninsula projects, check the local ground snow load map. Lake-effect snow bands dramatically increase structural steel joist sizing and truss framing. |
| New Jersey (NJ) | IECC Climate Zone 4A (Mixed-Humid) and Zone 5A (North) | In the Meadowlands and coastal zones, review pile foundation schedules carefully. Deep organic silts often require 60-100 foot driven piles to reach solid bearing strata. |
| Virginia (VA) | IECC Climate Zone 4A (Mixed-Humid) and Zone 5A in western Blue Ridge | In Loudoun and Prince William counties (Data Center Alley), electrical and mechanical estimates must account for high-redundancy N+1 or 2N infrastructure, heavy switchgear, and massive precast sound enclosures. |
| Washington (WA) | IECC Climate Zones 4C (Marine, West) and 5B (Semi-Arid, East) | The Washington State Energy Code (WSEC) is among the most demanding in the nation. Review mechanical drawings closely: fossil-fuel gas heating is strictly restricted in commercial buildings. |
| Arizona (AZ) | IECC Climate Zone 2B (Dry Desert) and Zone 4B/5B in northern high country | Check geotechnical reports for caliche depth. Excavation bids without hard rock allowances can face massive change order disputes during utility trenching. |
| Massachusetts (MA) | IECC Climate Zone 5A (Cold, Humid) | Check if the municipality has adopted the Specialized Opt-in Stretch Energy Code. This code can mandate all-electric heating, net-zero readiness, and higher continuous insulation values. |
| Tennessee (TN) | IECC Climate Zone 4A (Mixed-Humid) | Nashville construction is defined by rock excavation. Bids without explicit rock allowances will incur major change orders as soon as backhoes hit solid limestone 18 inches below grade. |
| Indiana (IN) | IECC Climate Zone 4A (Central/South) and Zone 5A (North) | In northwest Indiana (Lake and Porter counties), verify if local municipal codes require Chicago-style conduit electrical wiring due to proximity to the Chicago trade jurisdiction. |
| Missouri (MO) | IECC Climate Zone 4A (Mixed-Humid) and Zone 5A in Northern Missouri | In the Missouri Bootheel (Pemiscot, New Madrid, Dunklin counties), seismic design categories jump to D and E, requiring heavy structural steel bracing and foundation tie beams. |
| Maryland (MD) | IECC Climate Zone 4A (Mixed-Humid) and Zone 5A in Western Maryland | In Montgomery, Frederick, and Howard counties, verify if municipal environmental codes impose strict forest conservation or high-performance energy stretch codes that exceed state minimums. |
| Wisconsin (WI) | IECC Climate Zones 5A and 6A (Cold Continental) | Winter concrete protection costs in Wisconsin are substantial. When bidding projects scheduled between November and April, include explicit line items for ground thaw heaters and insulated blankets. |
| Colorado (CO) | IECC Climate Zones 5B, 6B, and 7 (Cold, Semi-Arid & Alpine) | Do not price standard spread footings in Front Range projects without reviewing the geotechnical borings; swelling bentonite clay almost always necessitates drilled piers and void forms. |
| Minnesota (MN) | IECC Climate Zones 6A (South) and 7 (North) | Foundation excavation and concrete costs in Minnesota are heavily impacted by frost depth requirements (up to 5 feet deep). Factor in significant concrete yardage for tall frost walls. |
| South Carolina (SC) | IECC Climate Zone 3A (Humid Subtropical) | In the Charleston metro, check structural seismic design categories carefully. Despite its coastal location, the 1886 Charleston earthquake creates strict seismic rebar and steel connection mandates. |
| Alabama (AL) | IECC Climate Zone 3A (Humid Subtropical) | In Baldwin and Mobile counties, verify if project plans mandate IBHS Fortified Commercial standards, which significantly impact roof attachment and window impact ratings. |
| Louisiana (LA) | IECC Climate Zone 2A (Hot, Humid Subtropical) | Verify pile cut-off elevations and load-test requirements on structural drawings. In south Louisiana, virtually all commercial structures require driven deep foundation piles. |
| Kentucky (KY) | IECC Climate Zone 4A (Mixed-Humid) | In the central Bluegrass and Bowling Green areas, check geotechnical reports for karst sinkhole anomalies; civil bids should include clear allowances for stone backfill and geogrid stabilization. |
| Oregon (OR) | IECC Climate Zone 4C (Marine, West) and Zone 5B/6B (Semi-Arid/Cold, East) | Never estimate standard direct-applied exterior cladding in western Oregon. OSSC mandates a functional rainscreen drainage cavity behind all siding systems to manage persistent moisture. |
| Oklahoma (OK) | IECC Climate Zone 3A and 4A (Mixed-Humid & Semi-Arid) | Examine structural specifications for ICC 500 storm shelter mandates in public educational projects. These hardened rooms require reinforced concrete lids and FEMA-rated blast doors. |
| Connecticut (CT) | IECC Climate Zone 5A (Cold, Humid) | Verify ledge rock depths on civil grading plans. Encountering shallow granite ledge in Fairfield or New Haven counties requires expensive hydraulic hammering. |
| Utah (UT) | IECC Climate Zones 5B and 6B (Cold Semi-Arid & Mountain) | Always verify Seismic Design Category on Wasatch Front drawings. SDC D requires special reinforced concrete shear walls, seismic steel connections, and certified MEP equipment seismic restraints. |
| Iowa (IA) | IECC Climate Zones 5A and 6A (Cold Continental) | Account for extensive topsoil stripping in civil earthwork. Iowa farm-belt topsoils are exceptionally deep and cannot support commercial foundation loads without being stripped and stockpiled. |
| Nevada (NV) | IECC Climate Zone 3B (Dry Desert, South) and Zone 5B (Cold Semi-Arid, North) | In Clark County (Las Vegas), never omit caliche rock excavation unit prices from earthwork bids. Hard caliche layers are widespread and will quickly destroy standard backhoe buckets. |
| Arkansas (AR) | IECC Climate Zone 3A and 4A (Humid Subtropical) | In northeast Arkansas, verify if seismic design categories D0 or D1 apply due to the New Madrid Fault, which increases structural steel anchor bolt requirements. |
| Mississippi (MS) | IECC Climate Zone 3A and 2A (Humid Subtropical) | In the Jackson metro area, always review the geotechnical report for Yazoo clay. This highly expansive montmorillonite clay can lift standard slabs several inches if not properly isolated. |
| Kansas (KS) | IECC Climate Zones 4A and 5A (Semi-Arid to Continental) | Review educational and institutional drawings for ICC 500 tornado shelter requirements. These concrete and reinforced masonry enclosures carry heavy structural and MEP damper costs. |
| New Mexico (NM) | IECC Climate Zones 3B, 4B, and 5B (Dry, Semi-Arid & Mountain) | On Albuquerque West Mesa projects, verify basalt rock ledge depth. Surface volcanic basalt rock requires heavy mechanical hammering for foundation footings and sewer lines. |
| Nebraska (NE) | IECC Climate Zone 5A (Cold Continental) | In the Omaha bluffs and eastern Nebraska, check for hydro-collapsible loess soils. These wind-blown silt soils lose strength when wet and frequently require deep moisture conditioning. |
| West Virginia (WV) | IECC Climate Zone 4A (Mixed-Humid) and Zone 5A in Mountain Counties | In historic mining counties, verify if mine subsidence reports indicate underground voids. Foundation stabilization over old mine shafts requires deep drilling and cement grout injection. |
| Idaho (ID) | IECC Climate Zones 5B and 6B (Cold, Semi-Arid & Mountain) | Review municipal frost line maps carefully. Foundation depths increase from 24 inches in Boise to 36-48 inches in mountain resort areas, directly increasing concrete formwork and excavation yardage. |
| Hawaii (HI) | IECC Climate Zone 1A (Tropical Wet/Dry) | All material takeoffs must incorporate ocean freight logistics fees, harbor wharfage charges, and substantial lead times for structural steel, MEP equipment, and finish goods imported from the mainland. |
| Maine (ME) | IECC Climate Zone 6A (Cold) and Zone 7 in Northern Maine | Confirm frost wall depths on foundation sections. A 5-foot frost depth in northern Maine requires significantly more concrete yardage and formwork than standard 3-foot foundations in mid-Atlantic states. |
| New Hampshire (NH) | IECC Climate Zone 6A (Cold) and Zone 7 in Northern White Mountains | Granite ledge is ubiquitous in New Hampshire. Check site civil cross-sections for rock line indicators to ensure blasting or rock hammering line items are included. |
| Rhode Island (RI) | IECC Climate Zone 5A (Cold, Coastal) | Projects along Narragansett Bay fall under CRMC jurisdiction. Verify if coastal velocity zones (V zones) mandate open pile foundations and breakaway wall construction. |
| Montana (MT) | IECC Climate Zone 6B (Cold, Semi-Arid) and Zone 7 (Alpine) | Winter conditions in Montana extend from October through April. Always evaluate winter protection heating fuel, thermal enclosure tarps, and thaw charges in general conditions. |
| Delaware (DE) | IECC Climate Zone 4A (Mixed-Humid) | Check groundwater monitoring wells in southern Delaware. High water tables frequently require continuous well-point dewatering throughout utility and foundation installation. |
| South Dakota (SD) | IECC Climate Zone 5A (East) and Zone 6A (West/North) | In central and western South Dakota, watch for expansive Pierre shale. Slabs-on-grade placed directly over Pierre shale without over-excavation will heave severely when moisture fluctuates. |
| North Dakota (ND) | IECC Climate Zone 6A and 7 (Severe Cold Continental) | North Dakota foundation estimates must account for up to 6 feet of frost depth. Shallow foundations will fail from frost heave; ensure full concrete frost wall quantities are captured. |
| Alaska (AK) | IECC Climate Zones 7 and 8 (Subarctic and Arctic) | Factor in high freight mobilization surcharges and seasonal barge shipping windows for all materials imported from the Pacific Northwest (Seattle/Tacoma ports). |
| Vermont (VT) | IECC Climate Zone 6A (Cold) and Zone 7 in Northern/Mountain areas | Review Act 250 permit conditions on civil drawings. Stringent erosion control, tree conservation buffers, and stormwater detention requirements can substantially increase site civil costs. |
| Wyoming (WY) | IECC Climate Zones 6B and 7 (Cold Semi-Arid & Alpine) | Prairie wind loads in Wyoming are among the highest in the interior US. Structural steel and metal building bids must account for heavy wind bracing, stiffened purlins, and heavy-duty roof fasteners. |
Quantity takeoff services are centered on the United States. The same remote desk can measure drawings for a project in Canada, the United Kingdom, Australia, or the United Arab Emirates. You send the governing code and specification. The schedule records those documents. It does not apply a U.S. code to a project that cites a different one.
There is no office, street address, or local license claimed in those countries. Most estimates are still delivered in 24-48 hours when the set is complete. Typical fees are $150 to $1,000 per estimate and are confirmed after review.
No. Quantity Takeoff Experts measures from the drawing set you send. The phone and email on this site are for a nationwide digital desk. A state or city name is not a street address, a local license, or a claim that a reviewer is based there.
No. Quantities follow the drawings, specifications, and addenda for that project. If those documents cite a code edition, wind speed, snow load, seismic design category, or assembly, the schedule records that requirement. Confirming the adopted code with the authority having jurisdiction stays with the design team.
Send the current drawing issue, specifications, addenda, project address or jurisdiction, requested trades, and bid deadline. Identify alternates and any spreadsheet template you need. The proposal confirms scope, fee, and delivery after the documents are reviewed.
Only when the issued documents specify different assemblies, fasteners, insulation, equipment, or reinforcement. Location by itself is not a quantity. If the structural notes, geotechnical report, or specifications are missing, those items are listed as unresolved rather than filled in from a statewide assumption.
Yes, as a remote quantity takeoff. The United States is the primary market. Send the drawing set, the governing specifications, the trades, and the bid deadline. There is no office in Canada, the United Kingdom, Australia, or the United Arab Emirates. The proposal says whether that scope is accepted and whether delivery is 24-48 hours.
Most estimates typically cost $150 to $1,000 per estimate, whether the job is in your home state or another one. Project size and scope set the fee. The state name does not add a separate price.
Turnaround is typically 24 to 48 hours for most estimates. The drawings travel to the same remote desk either way.