Commercial Quantity Takeoff Services in 24-48 Hours
Commercial quantity takeoff services for retail, office, healthcare, and institutional sets. Shell, core, and tenant quantities stay separated. Most estimates are delivered in 24-48 hours.
Win Your Next Major Commercial Bid.
Upload the shell, core, and tenant sheets together. Commercial work is typically quoted at $150 to $1,000 per estimate, and most of those files return in 24 to 48 hours.
- ✓ Subcontractor Leveling
- ✓ RFI Generation
- ✓ Dedicated Senior Estimator
Built for Commercial General Contractors
Bidding on a commercial high-rise, a hospital, or a massive retail center requires analyzing thousands of pages of architectural, structural, and MEP blueprints. The risk of missing a single detail is financially catastrophic.
Our commercial estimating team acts as your impenetrable back-office. We comb through the specs, identify scope gaps, level your subcontractor bids, and build a bulletproof proposal that protects your profit margins.
- ✓ Detailed General Conditions & Requirements (Div 1)
- ✓ Complex Structural Concrete & Steel Analysis
- ✓ Commercial Interior Fit-Outs & Finishes
- ✓ Strict adherence to tight bid deadlines
Commercial Sectors We Serve
Expertise across every major commercial asset class.
Commercial Scope Checks Across Divisions
Commercial projects span many divisions, and gaps appear where one trade ends and another begins. The estimate lists scope by division and flags interfaces such as sleeves, firestopping, backing and equipment connections.
Example: a 20,000 SF suspended ceiling takes 20,000 / 4 = 5,000 tiles at 2 ft by 2 ft, or 20,000 / 8 = 2,500 tiles at 2 ft by 4 ft, before waste and before deducting areas with different ceiling types. The same plan area yields different counts depending on the module, which is why the ceiling schedule is read first.
- Drawing register, addenda and specification sections reconciled before measuring
- Interfaces between divisions listed as assumptions or exclusions
- Allowances kept apart from measured quantities
- Open questions tied to a sheet and detail so they can be answered and the estimate revised
Commercial Estimating FAQs
Do you estimate based on CSI MasterFormat?
Yes, all of our commercial estimates are strictly organized by the 50-division CSI MasterFormat standard. This ensures seamless integration into your existing bidding software and proposals.
Can you handle large-scale MEP estimating?
Absolutely. We have dedicated mechanical, electrical, and plumbing (MEP) estimators who specialize in complex commercial systems, including heavy ductwork, switchgear, and commercial piping.
How do you handle addenda during the bidding process?
Commercial bids frequently have addenda released days before the bid is due. We constantly monitor the bid documents and update our takeoffs immediately when an addendum changes the scope of work.
How much does a commercial estimate cost?
Most commercial estimates typically cost $150 to $1,000 per estimate. Shell, tenant, and multi-trade scope are what move the number.
How fast is a commercial estimate?
Commercial estimates are typically delivered in 24 to 48 hours.
Review the evidence before requesting a quote
The sample portfolio shows selected material quantities, units and drawing references. These are excerpts, not full estimates. Confirm your required pricing scope, deliverables, assumptions and exclusions in the project proposal. See the review checklist for document and quantity checks.