Bid Estimating Services Built on Quantity Takeoff
A bid package starts with quantity takeoff services, then levels the subcontractor quotes that are in scope. Most bid estimates are $150 to $1,000 and typically back in 24 to 48 hours. Project size and scope set the fee. You review and submit the proposal under your own name.
Why You Are Losing Bids (And How We Fix It)
1. Rushing the Takeoff
When you rush a bid at 11 PM, you miss details. A missed line item means you either lose the bid, or worse, you win it and lose money. We provide the dedicated time required for flawless accuracy.
2. Un-leveled Subcontractor Quotes
General Contractors often accept the lowest sub bid without realizing it excludes a massive piece of the scope. We meticulously level every sub bid to protect you from scope gaps.
3. Ignoring General Conditions
Many contractors fail to accurately price supervision, cleanup, and hoisting. We build comprehensive indirect cost models so your true overhead is fully covered.
Get Help on Your Next Bid
The Strategic Bidding Workflow
A systematic approach to conquering bid day.
Bid Document Review
We thoroughly analyze the Invitation to Bid (ITB), specs, addenda, and RFIs to identify the exact scope of work.
Scope & Takeoff
Execution of a highly detailed quantity takeoff to form the baseline of the estimate.
Subcontractor Leveling
For GCs, we review and level incoming subcontractor bids to catch omissions and ensure apples-to-apples comparisons.
Final Proposal Compilation
We finalize margins, apply indirect costs, and generate a professional, formatted bid proposal ready for submission.
Illustrative Bid-Day Leveling Workflows
Subcontractor Scope Equalization
When three drywall bids show wide variance, our estimators itemize framing, board yield, and finish levels side-by-side. We identify missing perimeter fire-stopping and unrated ceiling drops that would otherwise trigger change orders.
Deliverable: Standardized Scope-Comparison Matrix for GC executive sign-off.
Addenda & Alternate Reconciliation
When late architectural addenda alter structural steel connections and finish schedules, the revision review should isolate changed quantities and keep base bids, additions and deduct alternates separate under the agreed bid schedule.
Deliverable: Formatted Bid Form breakdown aligned with municipal procurement requirements.
Bid Estimating FAQs
Will you submit the bid on our behalf?
No. We operate as your back-office estimating department. We prepare all the documentation, pricing, and the final proposal, but you will review it and submit it to your client under your own company name.
What is a typical win rate?
Bid outcomes depend on project fit, competition, pricing, scope, and procurement conditions. We do not promise a win rate; review the documented quantities, assumptions, exclusions, and bid requirements before submission.
Do you help with RFIs during the bidding phase?
Yes. If we discover discrepancies in the blueprints or specifications during our review, we will immediately draft Requests for Information (RFIs) for you to send to the architect.
How much does a bid estimate cost?
A bid estimate typically costs $150 to $1,000. Most estimates in that range scale with the size of the set and the scope you include.
How fast is a bid estimate?
Most bid estimates are typically delivered in 24 to 48 hours.