Project size
Sheet count, floor area, and the number of buildings or phases change how long the measurement takes. A single tenant suite is not priced like a campus set.
A typical quantity takeoff is $150 to $1,000 per estimate. Most are delivered in 24-48 hours. The United States is the primary market. The fee and the date are confirmed after the drawings are reviewed, before work starts.
This range is the usual fee for a defined takeoff. It is not a coupon, a sale price, or a guaranteed bid total. Request a project quote with the current set.
Review redacted sample estimates before you upload plans for a quote.
Sheet count, floor area, and the number of buildings or phases change how long the measurement takes. A single tenant suite is not priced like a campus set.
One CSI division, such as concrete or electrical, is a smaller scope than a multi-trade package. Say which divisions are included and which are by others. Trade guides list the items each division counts.
A complete, scaled construction-document set is straightforward to measure. Missing dimensions, sheets marked not to scale, unresolved addenda, and narrative-only budgets take more review and can change the fee.
Quantities only, a material schedule, and a priced estimate are different files. Pricing labor and equipment is quoted with the rate source named in the proposal. Compare those outputs on the quantity takeoff services page.
Most estimates go back in 24-48 hours once the scope, fee, and drawing issue are agreed. Send the bid deadline with the plans. If the set is large or incomplete, the proposal gives a later date rather than a faster claim the documents cannot support.
The same remote desk measures projects in Canada, the United Kingdom, Australia, and the United Arab Emirates when you send the governing drawings. There is no office in those countries. U.S. projects remain the primary work. See how location is handled.
That is the typical range for a quantity takeoff estimate. The quote is set after the drawings are reviewed. A very small single-trade package can sit at the low end. A large multi-trade set, or a request that also prices labor and materials, can sit at the high end or above it. The proposal states the fee before work starts.
Yes. Most quantity takeoff services are delivered in 24-48 hours after the scope is confirmed. A larger sheet set, several trades, or drawings that are incomplete take longer. The proposal names the delivery date. There is no separate rush menu and no discount for a faster promise than the drawings support.
Send the current drawing set, specifications and addenda, the trades you want measured, the project location, and the bid deadline. Say whether you need quantities only or a priced estimate. Identify any spreadsheet template you need the file to follow.
No. The fee is the amount in the proposal for the scope you approved. There is no coupon, percentage-off offer, or limited-time rate on this page.
Send the current plans, the trades you need, and the bid deadline. The reply states the fee and whether 24-48 hour delivery fits that set.